Zakim/Bunker Hill Bridge (October 1997 - February 2003)
Contact: Brian Bahl, Kiewit Construction Company

    Services Completed:
  • Existing conditions
  • Topographic plans
  • Pre-construction hydrographic survey
  • Construction layout
  • Certified as-built plans

Consolidated Landfill and Remediation, Fort Devens (March 2000 - present)
Contact: Daniel Fournier, Stone & Webster

    Services Completed:
  • GPS
  • Existing Conditions Plans
  • Topographic plans
  • Intermediate and final as-built plans
  • Volume Calculations

I-93 Tunnel Finishes Boston, MA (May 2002 - present)
Contact: Greg Wilson, Perini/Kiewil/Cashman

    Services Completed:
  • Electronic Template Development for Layout of Paving
  • Cross Sections
  • Existing Conditions Plans
  • Volume Calculations
  • Shim/Grinding Plans for Final Grades

Broadway Bridge Refurbishment Boston, MA
Client: Massachusetts Highway Department

    Services Completed:
  • Pre and Post Dredge Surveys
  • Volume Calculations
  • Construction Lay-out
  • Certified As-Built Utility Drawings

Sithe Energy Project Weymouth, MA (December 2002 - present)
Contact: Jim D'Angelo, Bond Brothers Inc.

    Services Completed:
  • Existing Conditions Plans
  • Cut/Fill Volume Calculations
  • Construction Lay-out, including mechanical equipment and piping
  • As-Built Drawings

North Point Park Improvements CA/T Project C29A1 Boston, MA (July 2002 - present)
Contact: Jamie Doyle, Jay Cashman Inc.

    Services Completed:
  • Existing Conditions Survey
  • Significant Construction Layout
  • Volume Calculations
  • Mapping of Contaminated Soil
  • As-Built Drawings

Nyanza Superfund Site Ashland, MA (March 1999 - March 2001)
Contact: Daniel Fournier, Stone & Webster

    Services Completed:
  • Topographical Survey
  • Plan Development
  • Construction Layout, including easementsfor clean-up sites
  • As-Built Drawings

Nut Island Final Site Preparations Quincy, MA (October 1998 - April 1999)
Contact: Jerry Leone, EJ Smith Contracting Inc.

    Services Completed:
  • Utility, Roadway, Walkways and Site Grading

I-93 Chardon to Causeway CA/T Project C15A2 Boston, MA (May 2001 - present)
Contact: Rich DiRamio, Cashman/Kiewit/Atkinson

    Services Completed:
  • Construction Layout, including lift drawings
  • Re-Injectable Waterstop System As-Built Drawings

Logan International Airport "Terminal E Project" Boston, MA (May 2002 - present)
Contact: Robert Hallisey, Modern Continental Construction

    Services Competed:
  • Construction Layout
  • As-Built Location of Existing Structural Steel to Support Modifications

South Boston Interchange/World Trade Center CA/T Project C01A3 Boston, MA (April 2002 - present)
Contact: Dave Sefchok, Kiewit Construction Company

    Services Completed:
  • Construction Layout
  • Utility As-Builts
  • Volume Calculations

MWRA's Metrowest Tunnel Water Line Improvements (January 2001 - October 2002)
Contact: Jim Rosteck, Shea/Taylor/Healy JV

    Services Completed:
  • Construction Layout
  • Site Grading and Earthworks Calculations

Return to List of Projects


Home Our Services Featured Projects Personnel Employment Opportunities Professional Organizations Contact Us


A-Plus Construction Services Corporation

Phone: 781-681-6667
Fax:     781-681-6673


E-Mail: MCOLEMAN@APLUSSURVEY.COM

17 Accord Park Dr.
Norwell, MA  02061