Zakim/Bunker Hill Bridge (October 1997 - February 2003)
Contact: Brian Bahl, Kiewit Construction Company
Services Completed:
- Existing conditions
- Topographic plans
- Pre-construction hydrographic survey
- Construction layout
- Certified as-built plans
Consolidated Landfill and Remediation, Fort Devens (March 2000 - present)
Contact: Daniel Fournier, Stone & Webster
Services Completed:
- GPS
- Existing Conditions Plans
- Topographic plans
- Intermediate and final as-built plans
- Volume Calculations
I-93 Tunnel Finishes Boston, MA (May 2002 - present)
Contact: Greg Wilson, Perini/Kiewil/Cashman
Services Completed:
- Electronic Template Development for Layout of Paving
- Cross Sections
- Existing Conditions Plans
- Volume Calculations
- Shim/Grinding Plans for Final Grades
Broadway Bridge Refurbishment Boston, MA
Client: Massachusetts Highway Department
Services Completed:
- Pre and Post Dredge Surveys
- Volume Calculations
- Construction Lay-out
- Certified As-Built Utility Drawings
Sithe Energy Project Weymouth, MA (December 2002 - present)
Contact: Jim D'Angelo, Bond Brothers Inc.
Services Completed:
- Existing Conditions Plans
- Cut/Fill Volume Calculations
- Construction Lay-out, including mechanical equipment and piping
- As-Built Drawings
North Point Park Improvements CA/T Project C29A1 Boston, MA (July 2002 - present)
Contact: Jamie Doyle, Jay Cashman Inc.
Services Completed:
- Existing Conditions Survey
- Significant Construction Layout
- Volume Calculations
- Mapping of Contaminated Soil
- As-Built Drawings
Nyanza Superfund Site Ashland, MA (March 1999 - March 2001)
Contact: Daniel Fournier, Stone & Webster
Services Completed:
- Topographical Survey
- Plan Development
- Construction Layout, including easementsfor clean-up sites
- As-Built Drawings
Nut Island Final Site Preparations Quincy, MA (October 1998 - April 1999)
Contact: Jerry Leone, EJ Smith Contracting Inc.
Services Completed:
- Utility, Roadway, Walkways and Site Grading
I-93 Chardon to Causeway CA/T Project C15A2 Boston, MA (May 2001 - present)
Contact: Rich DiRamio, Cashman/Kiewit/Atkinson
Services Completed:
- Construction Layout, including lift drawings
- Re-Injectable Waterstop System As-Built Drawings
Logan International Airport "Terminal E Project" Boston, MA (May 2002 - present)
Contact: Robert Hallisey, Modern Continental Construction
Services Competed:
- Construction Layout
- As-Built Location of Existing Structural Steel to Support Modifications
South Boston Interchange/World Trade Center CA/T Project C01A3 Boston, MA
(April 2002 - present)
Contact: Dave Sefchok, Kiewit Construction Company
Services Completed:
- Construction Layout
- Utility As-Builts
- Volume Calculations
MWRA's Metrowest Tunnel Water Line Improvements (January 2001 - October 2002)
Contact: Jim Rosteck, Shea/Taylor/Healy JV
Services Completed:
- Construction Layout
- Site Grading and Earthworks Calculations
|